Tuesday, May 08, 2007

Building a retaining wall

The highway needs to have a connection to the local surface street--so here we see a crew putting up the retaining wall for the highway off-ramp.

Monday, May 07, 2007

Time to bring the rock sub-base.

L&N has a fleet of dumps to
do the job.